CORE case study · Bathampton

2,100 m² of gravel access at Tyning Meadows

Charlcombe Homes used 2,100 m² of CORE DRIVE across the drives and access areas of a ten-home development in Bathampton.

Client
Charlcombe Homes
Sector
Residential development
Location
Bathampton
CORE components
CORE DRIVE
Completed CORE DRIVE gravel approach at Tyning Meadows.
CORE project · Bathampton
012,100 m²

CORE DRIVE installed

0210 homes

Residential development

03Bathampton

Rural setting

04Permeable gravel

Completed finish

Project context

A landscape shaped by its purpose.

Tyning Meadows is a ten-home residential development by Bath-based housebuilder Charlcombe Homes. The architecture and landscape sit against the surrounding Bathampton countryside.

The driveways and shared access needed a natural gravel character without leaving loose stone uncontrolled across everyday vehicle routes. The same surface language was repeated across 2,100 m² of the development.

The brief

What the project had to achieve.

Create a stable gravel finish across a substantial multi-property development while complementing the rural Bathampton setting and supporting everyday vehicle access and parking.

  1. 01

    Rural character

    The driveway finish needed to complement the countryside setting and the individual homes.

  2. 02

    Everyday traffic

    The shared access and drives needed a controlled surface under regular residential vehicle movement.

  3. 03

    Consistent installation

    One repeatable gravel system was required across ten properties and 2,100 m².

  4. 04

    Permeable surface

    Rainfall needed to pass through the gravel and supporting surface layer.

Completed decorative gravel driveway at Tyning Meadows.
Completed surface · CORE DRIVE beneath decorative gravel
The CORE solution

Selected around the site—not just the surface.

CORE DRIVE panels were installed throughout 2,100 m² of driveways and accessways, then filled and covered with selected decorative aggregate.

CORE DRIVE panels were laid across the prepared access and driveway construction. Decorative aggregate was filled into and placed over the cells to conceal the grid.

The honeycomb structure confines the stone, while the heat-welded geotextile backing closes the underside of the cells and helps separate the surface from the bedding layer.

The same system was repeated across the ten homes, giving the development a consistent gravel finish from plot to plot.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Prepared driveway formation and supporting construction

  2. 02

    Project bedding layer

  3. 03

    CORE DRIVE membrane-backed gravel grid

  4. 04

    Selected decorative aggregate filled into and covering the cells

The result

The completed development uses a consistent, permeable gravel surface across ten homes, with the cellular grid largely concealed below the aggregate.

Project outcomes

  • A consistent stabilised gravel finish across ten homes
  • Cellular confinement intended to reduce loose-stone migration
  • The filled grid remains largely hidden beneath the decorative aggregate
  • A permeable surface suited to the development’s landscape character
Project team

The people behind the project.

Client / housebuilder
Charlcombe Homes
Project
Tyning Meadows
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews