CORE case study · Colchester

Permeable parking across Colchester Sports Park

9,380 m² of CORE COMMERCIAL and CORE GRASS created gravel parking bays and green overflow parking across a 76-acre sports destination.

Client
Colchester Borough Council
Sector
Sport & leisure
Location
Colchester
CORE components
CORE COMMERCIAL & CORE GRASS
Completed parking and sports facilities at Colchester Sports Park.
CORE project · Colchester
019,380 m²

Total CORE surface area

025,640 m²

CORE COMMERCIAL

033,740 m²

CORE GRASS

0476 acres

Wider sports park

Project context

A landscape shaped by its purpose.

Colchester Borough Council developed a 76-acre sports park with a leisure centre, rugby clubhouse, external pitches and large-scale visitor parking. Breheny Civil Engineering and RG Carter Construction delivered the external works.

The parking strategy used different surface treatments according to use: macadam for the principal access roads, gravel stabilisation for the parking bays and reinforced grass for overflow capacity.

The brief

What the project had to achieve.

Provide accessible, durable parking for a high-traffic sports destination while reducing the visual impact of extensive conventional hard surfacing and retaining a permeable green overflow area.

  1. 01

    High visitor demand

    The parking areas needed to support regular use around a major leisure and sports destination.

  2. 02

    Accessible movement

    The principal parking surfaces were intended to provide a firm, controlled route for visitors, including wheelchair users.

  3. 03

    Green overflow capacity

    Additional parking needed to remain visually integrated with the landscape rather than becoming continuous hard surfacing.

  4. 04

    Permeable surfaces

    The gravel and grass areas needed to allow rainfall into the project-designed drainage construction below.

Completed stabilised gravel parking at Colchester Sports Park.
Completed surface · CORE COMMERCIAL parking bays
The CORE solution

Selected around the site—not just the surface.

Macadam access roads were combined with 5,640 m² of CORE COMMERCIAL gravel parking and 3,740 m² of CORE GRASS overflow parking.

CORE COMMERCIAL was installed across the gravel parking bays. The cellular panels confine the selected aggregate and help control migration under vehicle use.

CORE GRASS formed the green overflow areas, reinforcing the planted finish while retaining the visual character of grass around the wider sports landscape.

A 6–12 mm angular gravel finish completed the CORE COMMERCIAL bays, while CORE GRASS HD established the green overflow areas.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Prepared formation, drainage and supporting sub-base

  2. 02

    Macadam principal access roads

  3. 03

    CORE COMMERCIAL with 6–12 mm angular gravel across parking bays

  4. 04

    CORE GRASS with the project planting build-up across overflow parking

The result

The completed 9,380 m² surface package combines stable gravel bays, reinforced grass parking and a permeable landscape-led finish around the sports facilities.

Project outcomes

  • Stable gravel parking bays for regular visitor use
  • Reinforced grass overflow parking integrated with the landscape
  • Permeable surface layers supporting the project drainage strategy
  • A softer visual transition between parking, buildings and sports pitches
Project team

The people behind the project.

Client
Colchester Borough Council
Civil engineering contractor
Breheny Civil Engineering
Construction partner
RG Carter Construction
Architect
GT3 Architects
Merchant
Keyline Civils Specialists
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews