Accessible permeable parking at Cambridge Science Park

2,911 m² of gravel and grass reinforcement created accessible, permeable parking at the entrance to Cambridge Science Park.

Client
TUS Holdings and Trinity College
Sector
Commercial office campus
Location
Cambridge
Completion
Practical completion April 2021
CORE components
CORE COMMERCIAL & CORE GRASS
Cambridge Science Park building and landscaped parking area.
CORE project · Cambridge
012,911 m²

Total reinforced area

021,507m²

CORE COMMERCIAL

031,404m²

CORE GRASS

04210,000ft²

Office development

Project context

A landscape shaped by its purpose.

Buildings 1 and 2 at Cambridge Science Park provide 210,000ft² of commercial office space for technology and biomedical businesses. Positioned prominently at the entrance to the park, the buildings and surrounding landscape were designed by Scott Brownrigg to create a new, high-quality vision for the campus.

Sustainable, innovative and accessible parking was central to the external works. Bidwells Urban Design Studio needed hard-wearing everyday parking around the office buildings, green overflow capacity and a finish that complemented the architecture rather than reading as a conventional expanse of car park.

The brief

What the project had to achieve.

Provide accessible parking and circulation around prominent new office buildings while retaining a fully permeable, landscape-led finish and green overflow capacity.

  1. 01

    Accessible movement

    The principal parking areas and routes needed a firm, stable finish suitable for users with wheelchairs and walking aids.

  2. 02

    Green overflow parking

    The scheme needed additional vehicle capacity without turning the surrounding landscape into continuous hard surfacing.

  3. 03

    SuDS compliance

    The paved and reinforced areas were required to remain porous so rainfall could return to the ground through the build-up.

  4. 04

    Architectural fit

    Materials had to complement the new technology campus and clearly organise the parking areas without excessive visual delineation.

Close view of a completed gravel surface stabilised with CORE COMMERCIAL.
System detail · CORE COMMERCIAL beneath the gravel finish
The CORE solution

Selected around the site—not just the surface.

1,507m² of CORE COMMERCIAL and 1,404m² of CORE GRASS were coordinated across the gravel parking and green overflow areas, creating two distinct but complementary surfaces.

CORE COMMERCIAL was used across the principal gravel parking areas. Once filled, the cellular grid sits below the aggregate surface, controlling migration and creating the firm, even finish needed for regular commercial use while preserving the appearance of gravel.

CORE GRASS reinforced the green overflow parking, allowing occasional vehicle use while retaining a planted surface that blended into the wider landscape. Together, the two systems gave the design team a practical change in surface character without sacrificing permeability.

A 6–12 mm angular gravel finish completed the CORE COMMERCIAL areas. Bidwells used the contrast between gravel-stabilised and block-paved surfaces to organise the parking without excessive markings.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Prepared formation and permeable sub-base

  2. 02

    Bedding and growing layers coordinated to each surface

  3. 03

    CORE COMMERCIAL across gravel parking and CORE GRASS across green overflow parking

  4. 04

    6–12 mm angular gravel and planted grass finishes

The result

The completed 2,911 m² scheme combines accessible parking, reinforced grass overflow space and SuDS-compliant drainage within the entrance landscape.

Project outcomes

  • Firm, accessible gravel parking around the new office buildings
  • Reinforced grass overflow parking integrated into the landscape
  • Permeable surfaces supporting the project’s SuDS strategy
  • A clear visual relationship between gravel, grass and block paving
Project team

The people behind the project.

Client
TUS Holdings and Trinity College
Architect
Scott Brownrigg
Landscape architect
Bidwells Urban Design Studio
Main contractor
SDC Construction
Groundworks contractor
MJS Construction (March) Ltd
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews