Technical project support Huge UK Stockholding Nationwide supply01753 652 555WhatsAppCORE TRADE
CORE case study · Aylsham, Norfolk

3,310 m² of gravel driveways at Willow Park

3,310 m² of CORE DRIVE created consistent gravel driveways and frontage parking across Persimmon Homes’ Willow Park development in Aylsham.

Client
Persimmon Homes
Sector
Residential development
Location
Aylsham, Norfolk
CORE components
CORE DRIVE
Completed gravel driveways at Willow Park in Aylsham.
CORE project · Aylsham, Norfolk
013,310 m²

CORE DRIVE installed

02Persimmon

Housebuilder

03JMS

Groundworks contractor

04Aylsham

Norfolk location

Project context

A landscape shaped by its purpose.

Willow Park is a Persimmon Homes residential development in Aylsham, Norfolk. Gravel driveways and frontage parking form a visible part of the street scene across the scheme.

Persimmon Homes appointed JMS Contractors for the groundworks, with 3,310 m² of CORE DRIVE installed across the development.

The brief

What the project had to achieve.

Deliver a repeatable gravel driveway finish across a large residential development, giving each frontage a controlled surface while maintaining a coherent streetscape.

  1. 01

    Development-wide consistency

    Driveways across multiple plots needed one repeatable gravel surface treatment.

  2. 02

    Regular vehicle use

    The aggregate needed to remain controlled beneath day-to-day residential traffic.

  3. 03

    Clean frontages

    The completed driveways had to support a tidy and coherent streetscape.

  4. 04

    Permeable finish

    The gravel surface needed to retain its free-draining character.

CORE DRIVE gravel stabilisation grid and aggregate finish.
System reference · CORE DRIVE gravel stabilisation
The CORE solution

Selected around the site—not just the surface.

JMS Contractors installed 3,310 m² of CORE DRIVE across the development’s driveways and frontage parking areas before the selected gravel finish was applied.

CORE DRIVE grids were installed across 3,310 m² of driveways and frontage parking within the development.

The interconnected cells restrained the gravel beneath vehicle tyres, limiting movement and helping the surface retain an even appearance.

Using the same system across the plots gave the development a consistent gravel finish while retaining the visual character of loose aggregate.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Prepared residential driveway formation

  2. 02

    CORE DRIVE cellular gravel stabilisation

  3. 03

    Selected gravel infill and surface finish

The result

Willow Park gained a consistent permeable gravel treatment across its residential frontages, with the cellular grid controlling aggregate under regular vehicle use.

Project outcomes

  • Consistent gravel driveways across the development
  • Aggregate restraint under regular residential traffic
  • Permeable frontage parking with a natural finish
  • A repeatable installation across 3,310 m²
Project team

The people behind the project.

Housebuilder
Persimmon Homes
Contractor
JMS Contractors
Location
Aylsham, Norfolk
Technical downloads

Project and product documents.

Sources

Project sources.

  1. Willow Park (Aylsham) company recordCompanies House
  2. JMS ContractorsJMS Contractors
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews