Clean landscape interfaces at Lucy Cavendish College

792 linear metres of 100 mm CORE PRO EDGE formed clean straight and curved interfaces around Lucy Cavendish College’s completed 2022 hub.

Client
Lucy Cavendish College
Sector
Higher education
Location
Cambridge
Completion
Completed August 2022
CORE components
CORE PRO EDGE
Completed Lucy Cavendish College courtyard and landscape.
CORE project · Cambridge
01792 lm

CORE PRO EDGE installed

02100 mm

Profile height

03150 mm

Galvanised spiral pins

042022

Project completion

Project context

A landscape shaped by its purpose.

The 2022 redevelopment created an accessible new hub within Lucy Cavendish College, providing 72 en-suite bedrooms with cafe, dining, social and teaching space.

Landscaped routes reconnect the building with the existing gardens. Mullan Groundworks installed the CORE PRO EDGE, while SDC Builders delivered the wider project to R H Partnership Architects’ design.

The brief

What the project had to achieve.

Define durable, accessible paths and planted interfaces within a conservation-area campus using an edge that could form both straight runs and controlled curves.

  1. 01

    Accessible routes

    Clear and consistent path interfaces were needed around the new college hub.

  2. 02

    Conservation setting

    The edging needed to remain discreet beside brick, timber and planting.

  3. 03

    Curves and straights

    One profile family had to resolve the courtyard geometry.

  4. 04

    Low-maintenance material

    An anodised rust-free edge was preferred for external durability.

Completed path and planted landscape interface at Lucy Cavendish College.
Completed interface · CORE PRO EDGE within the landscape
The CORE solution

Selected around the site—not just the surface.

Mullan Groundworks aligned, joined and secured 792 metres of CORE PRO EDGE 100 mm before the adjoining resin-bound paths were completed over their macadam base.

CORE PRO EDGE 100 mm in 6063A anodised aluminium was aligned to the design geometry and joined using rear connector strips.

The profiles were secured with 150 mm galvanised spiral pins before the resin-bound paths were laid over the macadam base, creating a controlled edge without a visually intrusive front connection.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Macadam path base

  2. 02

    CORE PRO EDGE 100 mm aligned to the path and landscape geometry

  3. 03

    150 mm galvanised spiral pins

  4. 04

    Resin-bound surface completed alongside lawns and planting

The result

Crisp anodised-aluminium boundaries now define the paths and planting while remaining visually secondary to the brick, timber and landscaped setting.

Project outcomes

  • Clear interfaces between paths and planting
  • Straight runs and controlled courtyard curves
  • Rust-free anodised-aluminium edge
  • Discreet detailing within a conservation-area campus
Project team

The people behind the project.

Client
Lucy Cavendish College
Main contractor
SDC Builders
Architect / lead designer
R H Partnership Architects
Groundworks
Mullan Groundworks
Civil / structural engineer
Smith and Wallwork
MEP / sustainability
Max Fordham
Landscape / planning
Bidwells
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews