CORE case study · Tayport, Fife

700 m² of gravel stabilisation at Larick Campsite

700 m² of CORE COMMERCIAL created stable, permeable gravel around Larick Campsite’s amenity building and shared external areas.

Client
Tayport Community Trust
Sector
Community tourism
Location
Tayport, Fife
CORE components
CORE COMMERCIAL
Completed CORE COMMERCIAL gravel surface around the amenity building at Larick Campsite.
CORE project · Tayport, Fife
01700 m²

CORE COMMERCIAL installed

0232 pitches

Campsite capacity

03Tayport

Fife coastal location

04Community-led

Tayport Community Trust

Project context

A landscape shaped by its purpose.

Larick Campsite sits beside the Larick Centre in Tayport, close to Tentsmuir Forest and the Fife Coastal Path. The campsite and amenity building form the second phase of Tayport Community Trust’s community-led development.

The external works required a robust surface around a 32-pitch campsite and modern amenity building. 700 m² of CORE COMMERCIAL stabilised the gravel areas.

The brief

What the project had to achieve.

Provide a practical gravel surface for a community campsite, accommodating regular pedestrian and vehicle movement around the amenity building without losing the informal character of the site.

  1. 01

    Shared access

    The surface needed to accommodate people, luggage and campsite vehicles around the facilities.

  2. 02

    Stable gravel

    A broad gravel area required cellular restraint to limit rutting, migration and local displacement.

  3. 03

    Natural appearance

    The finished surface needed to suit the campsite’s informal coastal setting.

  4. 04

    Free-draining finish

    The external area needed to remain permeable around the amenity building.

Aerial view of the gravel external areas at Larick Campsite.
Completed campsite · gravel routes around the amenity facilities
The CORE solution

Selected around the site—not just the surface.

CORE COMMERCIAL was installed across 700 m² of the campsite’s external areas and filled with the selected gravel to create a controlled, permeable surface.

CORE COMMERCIAL grids were laid across 700 m² of the prepared external works around the campsite facilities.

The interconnected cellular surface restrained the selected gravel, creating a more consistent route for pedestrians and vehicles while keeping the aggregate finish visible.

The result combines the appearance of loose gravel with the control required for an operational campsite and its shared amenity spaces.

Products & quantities

Products used.

Installation

How the system was installed.

  1. 01

    Prepared external-works formation

  2. 02

    CORE COMMERCIAL cellular gravel stabilisation

  3. 03

    Selected gravel infill and surface finish

The result

The campsite gained a broad, stable gravel landscape around its amenity facilities, supporting day-to-day access while retaining a natural finish.

Project outcomes

  • Stable gravel around the campsite amenity building
  • A permeable surface for shared pedestrian and vehicle access
  • Cellular aggregate restraint across 700 m²
  • An external finish suited to the coastal campsite setting
Project team

The people behind the project.

Client
Tayport Community Trust
Architect
Collective Architecture
Location
Tayport, Fife
Technical downloads

Project and product documents.

Sources

Project sources.

  1. Larick CampsiteTayport Community Trust
  2. The Larick CentreCollective Architecture
Technical project support

Planning something similar?

Send the project location, intended use, drawings and photographs you have. The CORE team will help identify the relevant product route and the information still needed.

CORE Landscape Products: 5.0 / 5 · Excellent on Trustpilot from 533 reviews